Friday, September 25, 2009

A bit of very nice mill work appears

Ready for the varnish and installation

Porthole in place


the first port hole is placed !

Fresh air at last





I was glad we picked up the dorades before ABI disappeared, the deck is starting to look a little bit more complete. Bill did a nice job of fitting the handrail from inside the salon roof. Managed to keep everything well flush, something I shall appreciate greatly. The height is 6' 1" and that is excatly my height.

Electrics breaker panel fitted


Seems like a lot of wire awaiting connection. We have DC panel on top and AC down under a couple of battery switches and a couple of bilge pump switches underneath.

Thursday, September 3, 2009

Looking good

It seems that all the work done on the head door is worth it when it it is fitted. I feel it looks very sharp and when there is a bit of light the stain glass will start to show. There is a nice feeling of design coming together now with Bills clever use of wood, and nice architecture.